Project – Location

□ At 23 km from the downtown of Bucharest, the Romanian capital

□ West part of Bucharest on the A1 Bucharest-Pitesti highway, at km 23, in Bolintin Deal commune, Giurgiu County.

□ At 8 km from the actual Bucharest ring road

□ At only 4 km from the future ring road of Bucharest which will be part of Pan European corridor IV that will connect the A1 Bucharest-Pitesti highway to the A2 Bucharest-Constanta highway.

Project – Location

 

New ring road of Bucharest

 

 

 

Technical Specifications

 

THE LAND: POT max = 50% CUT = 1.5 The height of the buildings is not restricted by the PUG or PUZ, but it might be limited after realizing the PUD of the area at H max = P+4.(Height ˜ 17m), for warehouses.

INFRASTRUCTURE: The infrastructure of the plot is designed with a width sufficient enough to ensure a safe and fluent traffic of all vehicles. The roads are built to support a very high traffic of trucks and small vehicles, the loads calculated of the trucks up to 11 tons per axle. The land has direct access to the motorway trough the speeding up and speeding down lanes, as well as an actual bridge across the motorway at km 23, that ensures access on both directions of driving.

UTILITIES: Bucharest Industrial Park ensures all the necessary utilities for industrial, logistic and warehouses activities. Within the industrial park, there are connection points for electricity, natural gas, sewage and drainage supply, as well as the telecommunication networks.